Wednesday 14 November 2012

Funky Pump boxing shoot

The shoot on yesterday (Tuesday 13th) went alright actually. I'd hired Johan P. Kraugerud and Iain Rose to work as camera operators. Also hired Stine Kiran to take still pictures I could use for the DVD cover. 
We (camera operators) each took up a position in Oceana. Johan did mostly handheld and close ups, Iain did wide shots from the balcony above and I did wide shots and close ups from ground level. We got some great shots, so hopefully it will be okay. 

What could have better:

  • We were under the impression that there would be a 20 minute break between first and second half, but it was only 10 minutes. So this made transferring, putting batteries on charge etc. a bit more challenging. So next time I would have hired a runner to go back and forth between the cameras and laptop.
  • Also I would have like to have had one more camera, to get even more angles.
  • Maybe try having intercom of some sorts next time?
(C) Photographer Stine Kiran and TDL Media (Tom-Daniel Laugerud) 2012

I have to have it all done and delivered to Funky Pump by the 25th of November, so that leaves me 12 days to go through 9 hours of footage, edit, export and finish the Master disc*, so this will indeed be a fun challenge. (* I have already pre-made the rough template of the menu, so it's just a matter of filling in all the details, pictures, files etc.)

Keep you posted!

0 comments:

Post a Comment